First Utility District’s contractor will be replacing an existing sewer line beginning at the intersection of Northshore Drive and Osprey Point Lane. The line will be bored across Northshore Drive to the First Horizon Bank at the corner of Town Center Boulevard. Work is expected to begin in late April and be completed by July. Most of the line will be installed by a trenchless methodology, but there will be excavation to locate underground utilities and connect to existing lines. Incidental work may require pavement repair, re-seeding yards, and trimming or removal of landscaping in public right of way and existing utility easements. Your service should not be interrupted as a result of this work.